School Renewal Investment Report

Listed are all projects being funded under school renewal and school condition improvement. See current year and the previous year below.

School Name Project DescriptionProject Start DateCompletion Date or Anticipated Date for CompletionPercent Complete
Armadale Public SchoolReplace shoe cubbies with bench seating in rooms 106 and 10715-Nov-202415-Nov-20240%
Armadale Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Ashton Meadows Public SchoolFire Alarm System Renewal02-Jul-202531-Aug-20250%
Ashton Meadows Public SchoolHot Water Boilers Renewal02-Jul-202531-Aug-20250%
Ashton Meadows Public SchoolRoof Covering Renewal - Section R502-Jul-202531-Aug-20250%
Aurora Heights Public SchoolPaved Playing Fields and North East Stairs Renewal02-Jul-202531-Aug-20250%
Bakersfield Public SchoolHot Water Boilers Repair - Boiler #102-Jul-202531-Aug-20250%
Bakersfield Public SchoolRoadway, Parking Lot and Concrete Sidewalks Renewal02-Jul-202531-Aug-20250%
Baythorn Public SchoolRoof Covering Renewal - Section R1, R2 and R403-Jul-202531-Aug-20250%
Bayview Fairways Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Bayview Glen PSAll access washroom installation02-Jul-202531-Aug-20250%
Bayview Secondary SchoolDomestic Water Heaters Renewal01-Nov-202430-Jun-20250%
Bayview Secondary SchoolSiporex Roof Deck Repairs02-Jul-202531-Aug-20250%
Beverley Acres Public SchoolRoof Covering Renewal - Section R8, including Siporex Roof Deck, Ceilings and Lighting 02-Jul-202531-Aug-20250%
Beverley Acres Public SchoolSiporex Roof Deck Repairs02-Jul-202531-Aug-20250%
Bill Crothers Secondary SchoolFloor Finishes Renewal (Sand, Reline and Refinish) - Gym A 01-Jul-202504-Aug-20250%
Bill Crothers Secondary SchoolTelecom - Phone and Paging Systems Renewal20-Jul-202501-Aug-20250%
Black River Public SchoolTelecom - Phone and Paging Systems Renewal02-Jul-202530-Aug-20250%
Blue Willow Public SchoolRoadway and Concrete Sidewalks Renewal02-Jul-202531-Aug-20250%
Bogart Public SchoolRoadway, Parking Lot, Concrete Sidewalks and Retaining Walls Renewal02-Jul-202531-Aug-20250%
Boxwood Public SchoolRoadway, Parking Lot and Concrete Sidewalks Renewal02-Jul-202531-Aug-20250%
Brownridge Public SchoolRoadway, Parking Lot and Concrete Sidewalks Renewal02-Jul-202529-Aug-20250%
Bur Oak Secondary SchoolElevator Controls Renewal02-Jul-202529-Aug-20250%
Bur Oak Secondary SchoolTelecom - Phone and Paging Systems Renewal05-Aug-202515-Aug-20250%
Buttonville Public SchoolHot Water Boilers Renewal02-Jul-202531-Aug-20250%
Carrville Mills Public SchoolTelecom - Phone and Paging Systems Renewal10-Feb-202516-Feb-20250%
Castlemore Public SchoolPlumbing Fixtures - Wash Basin Renewal 
 
01-Dec-202431-Dec-20240%
Cedarwood Public SchoolHVAC Controls & Instrumentation Renewal02-Jul-202531-Aug-20250%
Central Park Public SchoolCommunity Classroom Renovations01-Jul-202522-Aug-20250%
Charlton Public SchoolRoof Covering Renewal - Section R103-Jul-202531-Aug-20250%
Charlton Public SchoolTelecom - Phone and Paging Systems Renewal24-Feb-202502-Mar-20250%
Coppard Glen Public SchoolRoadway, KG Paved Play Area and Concrete Sidewalks Renewal02-Jul-202531-Aug-20250%
Crosby Heights Public SchoolHot Water Boilers Repair - Boiler #107-Oct-202431-Jul-20250%
Crossland Public SchoolTelecom - Phone and Paging Systems Renewal24-Mar-202530-Mar-20250%
Discovery Public SchoolFloor Finishes Renewal - Gym and Music room02-Jul-202531-Aug-20250%
Doncrest Public SchoolFloor Finishes Renewal - Gym02-Jul-202531-Aug-20250%
Dr. G.W. Williams Secondary SchoolInstall two sets of roof stairs02-Jul-202531-Aug-20250%
Dr. G.W. Williams Secondary SchoolSiporex Roof Deck Repairs02-Jul-202531-Aug-20250%
Dr. John M. Denison Secondary SchoolExterior Wall Panels - Caulking Renewal02-Jul-202531-Aug-20250%
Dr. Roberta Bondar Public SchoolCCTV System Renewal02-Jul-202531-Aug-20250%
Ellen Fairclough Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Emily Carr Secondary SchoolUnderground Sanitary Piping Renewal02-Jul-202531-Aug-20250%
Forest Run Public SchoolHVAC Controls & Instrumentation Renewal02-Jul-202531-Aug-20250%
Fossil Hill Public SchoolHVAC Controls & Instrumentation Renewal02-Jul-202531-Aug-20250%
Franklin Street Public SchoolFire Alarm System Renewal01-May-202531-Aug-20250%
Franklin Street Public SchoolFloor Finishes Renewal - Library and damaged VCT tiles in Gym.   
Interior Lighting Renewal - East wing.   
Plumbing Piping Renewal - Gym changeroom washrooms. 
Repair foundation outside music room.
08-Mar-202516-Mar-20250%
Fred Varley Public SchoolDomestic Water Heaters Renewal14-Oct-202429-Nov-20240%
German Mills Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Glad Park Public SchoolRoof Covering Renewal - Section R1, R3, R4, R6 and R702-Jul-202531-Aug-20250%
Glen Shields Public SchoolRoof Covering Renewal - Section R4 and R703-Jul-202531-Aug-20250%
Greensborough Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Greensborough Public SchoolInstall a gymnasium divider
Renovation to create community classroom
add a calming room
02-Jul-202531-Aug-20250%
Hartman Public SchoolTelecom - Phone and Paging Systems Renewal07-Apr-202513-Apr-20250%
Hodan Nalayeh Secondary SchoolInstall of 4 barrier free door operators 30-Sep-202429-Nov-20240%
Hodan Nalayeh Secondary SchoolMulti-Year HVAC Renewal Project - Phase 4 - Daycare Rooftop Units and 1st floor Heat Pumps Renewal 
 
02-Jul-202531-Aug-20250%
Huron Heights Secondary SchoolLocker Renewal02-Jul-202531-Aug-20250%
J.L.R. Bell Public SchoolFloor Finishes Renewal - Main office01-Dec-202431-Dec-20240%
James Robinson Public SchoolRoadway Renewal - East 02-Jul-202531-Aug-20250%
John McCrae Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Julliard Public SchoolFloor Finishes Renewal - Gym02-Jul-202531-Aug-20250%
Julliard Public SchoolRoadway and Parking Lot Renewal02-Jul-202531-Aug-20250%
Keswick High SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Keswick High SchoolExterior Lighting - Light Standards -  Driveway and Receiving01-Jul-202531-Aug-20250%
Keswick Public SchoolTelecom - Phone and Paging Systems Renewal13-Jan-202519-Jan-20250%
Lakeside Public SchoolRoof Covering Renewal - Section R1, R2, R6, R7 and R902-Jul-202531-Aug-20250%
Langstaff Secondary SchoolRoof Covering Renewal - Section R302-Jul-202531-Aug-20250%
Langstaff Secondary SchoolSiporex Roof Deck Repairs02-Dec-202431-Aug-20250%
Langstaff Secondary SchoolTelecom - Phone and Paging Systems Renewal06-Jul-202517-Jul-20250%
Legacy Public SchoolFloor Finishes Renewal - Main office and Staff room20-Dec-202403-Jan-20250%
Legacy Public SchoolTelecom - Phone and Paging Systems Renewal22-Apr-202527-Apr-20250%
Lester B. Pearson Public SchoolRoof Covering Renewal - Section R3 and R702-Jul-202531-Aug-20250%
Lincoln Alexander Public SchoolPaved Playing Fields Renewal02-Jul-202531-Aug-20250%
Lincoln Alexander Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Lorna Jackson Public SchoolRoof Covering Renewal - Section R1, R2 and R302-Jul-202531-Aug-20250%
Louis-Honore Frechette Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Mackenzie Glen Public SchoolRoadway, Parking Lot and Paved Playfield Renewal02-Jul-202531-Aug-20250%
MacLeods Landing Public SchoolFloor Finishes Renewal - Main office02-Jul-202531-Aug-20250%
MacLeods Landing Public SchoolTelecom - Phone and Paging Systems Renewal05-May-202511-May-20250%
Maple Creek Public SchoolRoadway, Parking Lot, KG Paved Play Area and Concrete Sidewalks Renewal02-Jul-202531-Aug-20250%
Maple High SchoolDividing Curtain Renewal - Gym02-Jul-202531-Aug-20250%
Markham Gateway Public SchoolHot Water Boilers Repair - Boiler #103-Sep-202406-Jan-20250%
Markville Secondary SchoolExterior Curtain Wall System Renewal, including Aluminum doors - Stairwell B02-Dec-202406-Dec-20240%
Mazo de la Roche Public SchoolPaved Playing Fields Renewal01-Jul-202531-Aug-20250%
Michael Cranny Elementary SchoolPaved Playing Fields Renewal01-Jul-202531-Aug-20250%
Middlefield Collegiate InstituteExterior Curtain Wall System Renewal - Stairwell D02-Jul-202531-Aug-20250%
Milliken Mills High SchoolSkylight Renewal  - Skylights R11 & R12 01-Jul-202522-Aug-20250%
Milliken Mills Public SchoolFire Alarm System Renewal01-Jul-202522-Aug-20250%
Milliken Mills Public SchoolPaved Playing Fields Renewal01-Jul-202522-Aug-20250%
Moraine Hills Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Moraine Hills Public SchoolTelecom - Phone and Paging Systems Renewal20-May-202525-May-20250%
Morning Glory Public SchoolCCTV System Renewal02-Jul-202531-Aug-20250%
Morning Glory Public SchoolInstall chain-link fence - south-west area of the property11-Nov-202431-Dec-20240%
Mount Joy Public SchoolTelecom - Phone and Paging Systems Renewal02-Jun-202508-Jun-20250%
Nokiidaa Public SchoolCCTV System Renewal02-Jul-202531-Aug-20250%
O.M. MacKillop Public SchoolPaved Playing Fields Renewal02-Jul-202522-Aug-20250%
Oak Ridges Public SchoolPaved Playing Fields Renewal02-Jul-202531-Aug-20250%
Park Avenue Public SchoolCCTV System Renewal02-Jul-202531-Aug-20250%
Park Avenue Public SchoolTelecom - Phone and Paging Systems Renewal27-Jan-202501-Feb-20250%
Parkland Public SchoolCCTV System Renewal02-Jul-202531-Aug-20250%
Parkland Public SchoolHot Water Boilers Renewal15-Apr-202530-Sep-20250%
Parkland Public SchoolParking Lots Renewal02-Jul-202531-Aug-20250%
Parkview Public SchoolFire Alarm System Renewal02-Jul-202531-Aug-20250%
Parkview Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Pierre Elliott Trudeau High SchoolExterior Walls Renewal - Penthouse01-Jul-202522-Aug-20250%
Pine Grove Public SchoolPaved Playing Fields Renewal02-Jul-202531-Aug-20250%
Pleasantville Public SchoolRoof Covering Renewal - Section R4 and R502-Jul-202522-Aug-20250%
Poplar Bank Public SchoolFloor Finishes Renewal - Main office02-Jul-202531-Aug-20250%
Prince Charles Public SchoolCourtyard Refresh (wood chips)01-Oct-202431-Oct-2024100%
Prince Charles Public SchoolFloor Finishes Renewal - Main office and Music room01-Dec-202431-Dec-20240%
Prince Charles Public SchoolPaved Playing Fields Renewal - KG play area02-Jul-202531-Aug-20250%
Prince Charles Public SchoolRoof Top Unit Renewal - Main Office 22-Oct-202431-Dec-20240%
R.L. Graham Public SchoolExterior Windows Renewal02-Jul-202531-Aug-20250%
Red Maple Public SchoolCCTV System Renewal02-Jul-202531-Aug-20250%
Red Maple Public SchoolHVAC Controls & Instrumentation Renewal02-Jul-202531-Aug-20250%
Red Maple Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Red Maple Public SchoolCCTV System Renewal 01-Jul-202531-Aug-20250%
Richmond Hill High SchoolFire Alarm System Renewal02-Jul-202531-Aug-20250%
Richmond Hill High SchoolRoof Covering Renewal - Section R4A and R4B02-Jul-202531-Aug-20250%
Richmond Hill High SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Rogers Public SchoolTelecom - Phone and Paging Systems Renewal16-Jun-202522-Jun-20250%
Silver Pines Public SchoolRoof Covering Renewal - Section R4, R5, R7, R8 and R902-Jul-202522-Aug-20250%
Sir William Mulock Secondary SchoolHVAC Controls & Instrumentation Renewal02-Jul-202531-Aug-20250%
Sir William Mulock Secondary SchoolRoadway Renewal - South 02-Jul-202531-Aug-20250%
Sixteenth Avenue Public SchoolTelecom - Phone and Paging Systems Renewal02-Jul-202530-Aug-20250%
Stephen Lewis Secondary SchoolTelecom - Phone and Paging Systems Renewal08-Mar-202516-Mar-20250%
Stonebridge Public SchoolFloor Finishes Renewal - Main office02-Jul-202531-Aug-20250%
Stonehaven Elementary SchoolRoadway, Parking Lot and Concrete Sidewalks Renewal01-Jul-202531-Aug-20250%
Stouffville District Secondary School Elevator Controls Renewal02-Jul-202529-Aug-20250%
Sutton District High SchoolParking Lots Renewal02-Jun-202529-Aug-20250%
Teston Village Public SchoolCCTV System Renewal02-Jul-202531-Aug-20250%
Thornhill Public SchoolExterior Stair Renewal (East side)02-Jul-202531-Aug-20250%
Thornhill Secondary SchoolMain Underground Electrical Wiring and Conduit Renewal12-Oct-202413-Oct-2024100%
Tommy Douglas Secondary SchoolDomestic Water Heaters Renewal03-Sep-202431-Oct-2024100%
Unionville Meadows Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Unionville Public SchoolPaved Playing Fields Renewal01-Jul-202522-Aug-20250%
Vellore Woods Public SchoolHot Water Boilers Repair - Boiler #201-Dec-202431-Dec-20240%
Vellore Woods Public SchoolInstall barrier free door operators - Northwest exit15-Nov-202401-Dec-2024100%
W.J. Watson Public SchoolRoof Covering Renewal - Section R302-Jul-202531-Aug-20250%
Walter Scott Public SchoolHot Water Boilers Renewal02-Jul-202531-Aug-20250%
Westmount Collegiate lnstituteCooling Tower and Hot Water Boilers Renewal21-Oct-202415-Mar-202525%
Westmount Collegiate lnstituteParking Lot, Roadway and Concrete sidewalk Renewal02-Jul-202531-Aug-20250%
Whitchurch Highlands Public SchoolCCTV System Renewal02-Jul-202531-Aug-20250%
Willowbrook Public SchoolTelecom - Phone and Paging Systems Renewal18-Aug-202522-Aug-20250%
Wilshire Elementary SchoolFloor Finishes Renewal - Library02-Jun-202529-Aug-20250%
Windham Ridge Public SchoolSecurity System Renewal02-Jul-202531-Aug-20250%
Yorkhill Elementary SchoolFloor Finishes Renewal - Music room and classrooms 102,10301-Dec-202431-Dec-20240%

School Name Project DescriptionProject Start DateCompletion Date or Anticipated Date for CompletionPercent Complete
Adrienne Clarkson Public SchoolSecurity System Renewal 17-Jun-202423-Aug-2024100%
Aldergrove Public SchoolHot Water Heating - Valve Actuators Renewal  - Classrooms08-Jan-202411-Jan-2024100%
Aldergrove Public SchoolNetwork Hardware Renewal11-Mar-202415-Apr-2024100%
Alexander Mackenzie High SchoolInstall one barrier free auto-door operator at community classroom 15202-Jul-202430-Aug-2024100%
Alexander Mackenzie High SchoolRoof Covering Renewal - Section R1, R3, R13 and North Canopy02-Jul-202430-Aug-2024100%
Alexander Muir Public SchoolCCTV System Renewal 02-Jul-202430-Aug-2024100%
Alexander Muir Public SchoolHot Water Heating - Valve Actuators Renewal - Throughtout02-Jul-202430-Aug-2024100%
Alexander Muir Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Anne Frank Public SchoolInstall fencing to isolate play area from bus loop02-Jul-202430-Aug-2024100%
Armadale Public SchoolFloor Finishes Renewal - Main corridor, 2nd Floor Student Washrooms 220, 221, 230, 231 and staff washrooms 223, 22402-Jul-202430-Aug-2024100%
Armadale Public SchoolHot Water Boilers and Domestic Water Heaters Renewal 01-Jul-202430-Sep-2024100%
Armadale Public SchoolNetwork Hardware Renewal11-Mar-202415-Apr-2024100%
Armadale Public SchoolUpdate Rooms 116 and 117 - Flooring, IT, Electrical, Paint, removal of old millwork03-Jul-202430-Aug-2024100%
Armitage Village Public SchoolNetwork Hardware Renewal11-Mar-202415-Apr-2024100%
Ashton Meadows Public SchoolHot Water Boiler #1 Renewal - Boiler Only10-Jun-202430-Aug-2024100%
Ashton Meadows Public SchoolHot Water Boiler #2 Repair01-Sep-202331-Dec-2023100%
Ashton Meadows Public SchoolNetwork Hardware Renewal11-Mar-202415-Apr-2024100%
Ashton Meadows Public SchoolRoof Covering Renewal - Section R2, R3, R4 and R6
Window Renewal - Stairwell A (4 windows)
02-Jul-202423-Aug-2024100%
Aurora Grove Public SchoolNetwork Hardware Renewal11-Mar-202415-Apr-2024100%
Aurora Heights Public SchoolFloor Finishes Renewal - Gym02-Jul-202415-Sep-2024100%
Aurora Heights Public SchoolNetwork Hardware Renewal11-Mar-202415-Apr-2024100%
Aurora Heights Public SchoolRoof Covering Renewal - Section R2, R4 and R502-Jul-202430-Aug-2024100%
Aurora High SchoolPedestrian Paving Renewal - West Asphalt Pathway and Portion of North Interlock Pathway02-Jul-202430-Aug-2024100%
Bakersfield Public SchoolPaved Playing Fields Renewal02-Jul-202416-Aug-2024100%
Ballantrae Public SchoolCeiling and Interior Lighting Renewal - Corridors02-Jul-202426-Aug-2024100%
Ballantrae Public SchoolNetwork Hardware Renewal11-Mar-202415-Apr-2024100%
Barbara Reid Public SchoolHot Water Heating - Valve Actuators Renewal  - Classrooms02-Jul-202430-Aug-2024100%
Barbara Reid Public SchoolNetwork Hardware Renewal11-Mar-202415-Apr-2024100%
Baythorn Public SchoolRoof Covering Renewal - Section R3, R4, R5 and R602-Jul-202416-Aug-2024100%
Baythorn Public SchoolRoom Signage Renewal02-Jul-202430-Aug-2024100%
Bayview Fairways Public SchoolCooling Centre - Gym, Library, Main office02-Jul-202430-Aug-2024100%
Bayview Glen Public SchoolAll Access Washroom Renovation - Design only 30-Apr-202430-Aug-20240%
Bayview Secondary SchoolFire Alarm System Renewal01-May-202423-Aug-2024100%
Bayview Secondary SchoolRoof Deck Inspection - Entire school (Repairs to Follow)15-Aug-202426-Aug-2024100%
Beckett Farm Public SchoolNetwork Hardware Renewal11-Mar-202415-Apr-2024100%
Beckett Farm Public SchoolParking Lot Extension02-Jul-202431-Aug-2024100%
Beverley Acres Public SchoolAsbestos Remidiation - Drywall Ceilings above existing T-bar ceiling - East Wing Classrooms15-Aug-202423-Aug-2024100%
Beverley Acres Public SchoolSite Drainage Repairs - Waste garbage bins area, north and west exterior building02-Jul-202430-Aug-2024100%
Beynon Fields Public SchoolHot Water Heating - Valve Actuators Renewal - Throughtout02-Jan-202405-Jan-2024100%
Bill Crothers Secondary SchoolCentral Air Handler ACS1 - Chilled Water (Cooling) Coil Renewal08-Jul-202431-Jul-2024100%
Bill Crothers Secondary SchoolComplete Site Study (drainage / parking lot islands, retaining wall / sidewalk, speed bumps)15-Jul-202415-Aug-2024100%
Bill Hogarth Secondary SchoolExterior Wall Repairs 23-May-202423-May-2024100%
Black River Public SchoolParking Lot Renewal02-Jul-202430-Aug-2024100%
Blue Willow Public SchoolExterior Signage - Pylon sign 02-Jul-202430-Aug-2024100%
Bogart Public SchoolHot Water Boilers Renewal 
Cooling Centre - Gym, Library, Main office
01-Jun-202430-Sep-2024100%
Bond Lake Public SchoolCCTV System Renewal 02-Jul-202430-Aug-2024100%
Bond Lake Public SchoolPaved Playfield Renewal - Kindergarten pen 02-Jul-202430-Aug-2024100%
Brownridge Public SchoolFloor Finishes Renewal - Kindergarten rooms 109, 110 and 111.02-Jul-202423-Aug-2024100%
Carrville Mills Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Castlemore Public SchoolHVAC Controls & Instrumentation Renewal01-Jun-202430-Aug-2024100%
Cedarwood Public SchoolSecurity System Renewal 01-Dec-202330-Apr-2024100%
Central Park Public SchoolDesign Exterior Ramp/Stairs to replace existing asphalt walkway02-Jul-202430-Aug-2024100%
Charlton Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Clearmeadow Public SchoolCooling Centre - Gym, Library, Main office and 
Fire Alarm System Renewal
04-Mar-202416-Oct-2024100%
Clearmeadow Public SchoolPaved Playing Fields Renewal02-Jul-202416-Aug-2024100%
Cornell Village Public SchoolSecurity System Renewal 01-Dec-202330-Apr-2024100%
Crosby Heights Public SchoolCooling Centre - Gym, Library, Main office02-Jul-202430-Apr-202590%
Crosby Heights Public SchoolInspection of Siporex Roof Deck30-Aug-202430-Dec-202475%
Crossland Public SchoolWindows and Exterior Doors Renewal - All
Skylights Renewal - Sections R10 and R11
11-Mar-202426-Aug-2024100%
David Suzuki Public SchoolHot Water Heating - Valve Actuators Renewal  - Classrooms01-Mar-202415-Mar-2024100%
David Suzuki Public SchoolIntercom System Renewal and Main Security Keypad - Daycare06-May-202428-Jun-2024100%
Denne Public SchoolExterior Stairs Renewal - phase #2 - Locations #3, #402-Jul-202423-Aug-2024100%
Denne Public SchoolFloor Finishes Renewal - Library01-Jul-202430-Aug-2024100%
Devins Drive Public SchoolEnlarge KG Fencing for outdoor play area01-May-202431-Aug-2024100%
Discovery Public SchoolSecurity System Renewal 12-Aug-202430-Sep-2024100%
Donald Cousens Public SchoolRoof Covering Renewal - Section R101-Dec-202331-Jan-2024100%
Doncrest Public SchoolRenovate Storage room 145 into Calming room. 02-Jul-202430-Aug-2024100%
Dr. Bette Stephenson Centre for LearningCooling System - Split Ductless Renewal - Hub room 26-Feb-202427-Feb-2024100%
Dr. G.W. Williams Secondary SchoolExterior Doors Renewal - South West Doors15-Aug-202430-Aug-2024100%
Dr. G.W. Williams Secondary SchoolInstall Safety Railing along Roof R315-Aug-202430-Aug-2024100%
Dr. John M. Denison Secondary SchoolEmergency Lighting Renewal02-Jul-202430-Sep-2024100%
Dr. John M. Denison Secondary SchoolExterior Wall Repairs and Caulking Renewal02-Jul-202423-Aug-2024100%
Dr. John M. Denison Secondary SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Dr. Roberta Bondar Public SchoolPedestrian Paving Renewal03-Jul-202423-Aug-2024100%
Edward T. Crowle Public SchoolHydro Poles Renewal for Portables - Western Section11-Mar-202415-Mar-2024100%
Elders Mills Public SchoolPaved Playing Fields Renewal03-Jul-202423-Aug-2024100%
Elders Mills Public SchoolSecurity System Renewal 12-Aug-202430-Sep-2024100%
Emily Carr Secondary SchoolFloor Finishes Renewal - Main office, Library, Guidance and Staff room08-Jul-202430-Aug-2024100%
Emily Carr Secondary SchoolRoof Covering Renewal - Section R2, R3 and R1502-Jul-202423-Aug-2024100%
Fairwood Public SchoolSecurity System Renewal 01-Dec-202330-Apr-2024100%
Forest Run Public SchoolRoof Covering Renewal - Section R202-Jul-202431-Jul-2024100%
Forest Run Public SchoolSecurity System Renewal 02-Jul-202430-Aug-2024100%
Fossil Hill Public SchoolInstall Display Case - Main Lobby15-Aug-202430-Aug-2024100%
Fossil Hill Public SchoolSecurity System Renewal 12-Aug-202430-Sep-2024100%
Franklin Street Public SchoolInspection and Testing of Roof Deck to determine if Siporex30-Aug-202430-Dec-202475%
Franklin Street Public SchoolSecurity System Renewal 17-Jun-202423-Aug-2024100%
Fred Varley Public SchoolFloor Finishes Renewal - Gym - Maple Portion02-Jul-202430-Aug-2024100%
German Mills Public SchoolInstall infrastructure for new washer and dryer in room # 134. Special Education.27-Dec-202304-Jan-2024100%
Glad Park Public SchoolDomestic Water Heaters Renewal27-Nov-202305-Jan-2024100%
Glen Cedar Public SchoolExterior Stairs Renewal02-Jul-202430-Aug-2024100%
Glen Shields Public SchoolCCTV System Renewal 16-Oct-202331-Jan-2024100%
Greensborough Public SchoolFloor Finishes Renewal - Library18-Dec-202308-Jan-2024100%
Greensborough Public SchoolInstall Barrier Free Door Operators - BF Washroom 109 and Stairwell B (exterior and corridor door).23-Feb-202430-Apr-2024100%
Greensborough Public SchoolParking Lot and Roadway Renewal, and Parking Lot Expansion02-Jul-202430-Aug-2024100%
Henderson Avenue Public SchoolParking Lot Renewal02-Jul-202416-Aug-2024100%
Herbert H. Carnegie Public SchoolCCTV System Renewal 16-Oct-202331-Jan-2024100%
Highgate Public SchoolRoof Covering Renewal - Section R5 and R602-Jul-202430-Aug-2024100%
Highview Public SchoolHot Water Boilers, Heat Exchangers and Domestic Water Heaters Renewal03-Jun-202430-Sep-2024100%
Highview Public SchoolParking Lot and Roadway Renewal03-Jul-202423-Aug-2024100%
Hodan Nalayeh Secondary SchoolEmergency Lighting Generator Repair02-Jul-202426-Jul-2024100%
Hodan Nalayeh Secondary SchoolMulti-Year HVAC Renewal Project - Phase 302-Jul-202430-Aug-2024100%
Huron Heights Secondary SchoolDomestic Water Heaters Renewal02-Jan-202431-Jan-2024100%
Huron Heights Secondary SchoolFloor Finishes Renewal - Food Service Room 23515-Aug-202430-Aug-2024100%
Huron Heights Secondary SchoolFloor Finishes Renewal - Special Education Room 22015-Aug-202430-Aug-2024100%
Huron Heights Secondary SchoolRooftop Unit Renewal - Guidance and Main Office02-Jul-202431-Oct-2024100%
Huron Heights Secondary SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
James Robinson Public SchoolFire Alarm System Renewal01-Jun-202430-Nov-2024100%
Jersey Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
John McCrae Public SchoolDomestic Water Heaters Renewal02-Jan-202405-Jan-2024100%
John McCrae Public SchoolParking Lot, Roadway and Paved Playfield Renewal02-Jul-202424-Aug-2024100%
Johnsview Village Public SchoolFloor Finishes Renewal - Gym02-Jul-202430-Aug-2024100%
Joseph A. Gibson Public SchoolParking Lot Renewal02-Jul-202423-Aug-2024100%
Julliard Public SchoolPaved Playing Fields Renewal02-Jul-202430-Aug-2024100%
Julliard Public SchoolSecurity System Renewal 12-Aug-202430-Sep-2024100%
Keswick High SchoolBleachers Renewal - Large Gym02-Jul-202430-Aug-2024100%
Keswick High SchoolRoof Covering Renewal - Section R6 and R902-Jul-202423-Aug-2024100%
Keswick High SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Kettle Lakes Public SchoolCCTV System Renewal 01-Dec-202330-Apr-2024100%
Kettleby Public SchoolInspect and Repairs to Siporex Roof Deck 30-Aug-202430-Dec-202475%
King City Secondary SchoolCooling System - VRF Condensing Unit Repair15-Aug-202430-Aug-2024100%
Lake Simcoe Public SchoolFloor Finishes Renewal - Main office02-Jul-202426-Aug-2024100%
Lakeside Public SchoolPaved Playing Fields Renewal. 
Repair water leaking into hydro transformer vault
02-Jul-202426-Aug-2024100%
Langstaff Secondary SchoolHVAC Controls & Instrumentation Renewal01-Jun-202430-Aug-2024100%
Langstaff Secondary SchoolInspect and Repairs to Siporex Roof Deck 30-Aug-202430-Dec-202475%
Langstaff Secondary SchoolRoof Covering Renewal - Section R402-Jul-202430-Aug-2024100%
Legacy Public SchoolExterior Wall Repairs01-Jul-202430-Aug-2024100%
Legacy Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Lester B. Pearson Public SchoolInstall chainlink fencing - East side of School by Childcare02-Jul-202430-Aug-2024100%
Lincoln Alexander Public SchoolRoadway and Pedestrian Paving Renewal02-Jul-202424-Aug-2024100%
Lorna Jackson Public SchoolSecurity System Renewal 18-Jan-202412-Apr-2024100%
Louis-Honore Frechette Public SchoolExterior Accessible Ramp Renewal - Porta pack.02-Apr-202424-Apr-2024100%
Mackenzie Glen Public SchoolParking Lot Renewal - East03-Jul-202423-Aug-2024100%
Mackenzie Glen Public SchoolSecurity System Renewal 11-Nov-202423-Dec-202475%
MacLeods Landing Public SchoolFloor Finishes Renewal - Library02-Jul-202430-Aug-2024100%
MacLeods Landing Public SchoolInstall Roof Access Ladder on the South wall02-Jul-202430-Aug-2024100%
MacLeods Landing Public SchoolRoom Signage Renewal02-Jul-202430-Aug-2024100%
MacLeods Landing Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Maple Creek Public SchoolInstall Ceiling in Caretaking Room02-Jul-202430-Aug-2024100%
Maple Creek Public SchoolSecurity System Renewal 18-Jan-202412-Apr-2024100%
Maple Leaf Public SchoolHot Water Heating Piping - Repairs21-Feb-202423-Feb-2024100%
Maple Leaf Public SchoolParking Lot, Roadway and Pedestrian Paving Renewal02-Jul-202423-Aug-2024100%
Markham Gateway Public SchoolExterior Wall Repairs 11-Mar-202415-Mar-2024100%
Markham Gateway Public SchoolHVAC Controls & Instrumentation Renewal03-Jun-202401-Nov-2024100%
Markham Gateway Public SchoolSecurity System Renewal 01-Dec-202330-Apr-2024100%
Markville Secondary SchoolEmergency lighting Generator Repair22-Nov-202330-Nov-2023100%
Markville Secondary SchoolWindow Repairs - (North side - East end)02-Jul-202412-Jul-2024100%
Mazo de la Roche Public SchoolCeiling Renewal - Corridor27-Dec-202329-Dec-2023100%
Mazo de la Roche Public SchoolReplace Corridor hallway in Porta pack and stairwell23-Dec-202305-Jan-2024100%
Meadowbrook Public SchoolInstall partitions doors and building updates01-Mar-202431-Aug-2024100%
Meadowbrook Public SchoolPassenger Elevator Modernization02-Jul-202430-Aug-2024100%
Meadowbrook Public SchoolSecurity System Renewal 01-Feb-202412-Apr-2024100%
Michael Cranny Elementary SchoolExterior Signage - School sign 06-Nov-202310-Nov-2023100%
Michael Cranny Elementary SchoolParking Lot and Roadway Renewal03-Jul-202423-Aug-2024100%
Michael Cranny Elementary SchoolRenovate Washroon 122 to accomodate change table 02-Jul-202430-Aug-2024100%
Michaelle Jean Public SchoolDomestic Water Heaters Renewal02-Jul-202430-Aug-2024100%
Middlefield Collegiate InstituteCentral Air Handler AHU #5 - Chilled Water (Cooling) Coil Renewal01-May-202427-May-2024100%
Middlefield Collegiate InstituteRenovate Room 10803-Jul-202418-Oct-2024100%
Middlefield Collegiate InstituteRoof Covering Renewal - Section R15, R16, R18, R19, R21, R22 and R2302-Jul-202430-Sep-2024100%
Moraine Hills Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Moraine Hills Public SchoolUnpaved Playfield Repairs - Drainage and Swale 03-Jul-202423-Aug-2024100%
Morning Glory Public SchoolParking Lot Renewal02-Jul-202426-Aug-2024100%
Morning Glory Public SchoolRoof Covering Renewal - Section R8, R9, R10, R11, R12 and R1302-Jul-202426-Aug-2024100%
Mount Albert Public SchoolElectrical Branch Wiring Renewal - Above Ceiling of 1st Floor Corridor02-Jul-202426-Aug-2024100%
Mount Albert Public SchoolRoof Covering Renewal - Section R8, R9, R10, R11 and R1202-Jul-202426-Aug-2024100%
Mount Albert Public SchoolStair Lift Renewal02-Jul-202426-Aug-2024100%
Mount Joy Public SchoolFloor Finishes Renewal - Portables 553 and 73202-Jul-202430-Aug-2024100%
Mount Joy Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Nellie McClung Public SchoolCCTV System Renewal 16-Oct-202331-Jan-2024100%
Newmarket High SchoolFloor Finishes Renewal - Guidance and Metal Shop 137B24-Jun-202423-Aug-2024100%
Newmarket High SchoolRoof Covering Renewal - Section R1201-Jul-202430-Aug-2024100%
Northern Lights Public SchoolHot Water Boiler Repair - Boiler #101-Nov-202331-Dec-2023100%
Oscar Peterson Public SchoolFloor Finishes Renewal - Portables 5, 6 and 702-Jul-202430-Aug-2024100%
Park Avenue Public SchoolFloor Finishes Renewal - Terrazo Stair Treads02-Jul-202430-Aug-2024100%
Parkland Public SchoolPaved Playing Fields Renewal and Parking Lot Design 
 
02-Jul-202430-Aug-2024100%
Parkview Public SchoolFloor Finishes Renewal - Portables 625 and 72102-Jul-202430-Aug-2024100%
Phoebe Gilman Public SchoolDomestic Water Heaters Renewal02-Jan-202405-Jan-2024100%
Pierre Berton Public SchoolCCTV System Renewal 01-Dec-202330-Apr-2024100%
Pierre Berton Public SchoolMold Abatement Ceiling - Girls Washroom 105 02-Jul-202430-Aug-2024100%
Pierre Elliott Trudeau High SchoolInstall Padding in Calming room 104 and  wall padding over window in Calming room 10502-Jul-202430-Aug-2024100%
Pierre Elliott Trudeau High SchoolRoom Signage Renewal02-Jul-202430-Aug-2024100%
Pine Grove Public SchoolRoof Covering Renewal - Section R1 and R202-Jul-202416-Aug-2024100%
Poplar Bank Public SchoolSecurity System Renewal 17-Jun-202423-Aug-2024100%
Prince Charles Public SchoolRoom Signage Renewal02-Jul-202430-Aug-2024100%
R.L. Graham Public SchoolCCTV System Renewal 02-Jul-202430-Aug-2024100%
R.L. Graham Public SchoolExterior Windows  Renewal -   Design01-Jul-202531-Aug-20250%
R.L. Graham Public SchoolPaved Playing Fields Renewal02-Jul-202423-Aug-2024100%
R.L. Graham Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Ramer Wood Public SchoolFloor Finishes Renewal - Kindergarten Rooms (105, 106), Music Room (208) and Staff Washrooms (117A, 117B)22-Dec-202305-Jan-2024100%
Ramer Wood Public SchoolRoof Covering Renewal - Section R106-Aug-202430-Aug-2024100%
Randall Public SchoolSecurity System Renewal 01-Dec-202330-Apr-2024100%
Red Maple Public SchoolParking Lot Renewal02-Jul-202430-Aug-2024100%
Reesor Park Public SchoolFloor Finishes Renewal - Washrooms 159, 160, 246 and 24708-Mar-202415-Mar-2024100%
Reesor Park Public SchoolInstall Millwork - Rooms 239 and 24115-Aug-202415-Aug-2024100%
Regency Acres Public SchoolCCTV System Renewal 01-Dec-202330-Apr-2024100%
Richmond Green Secondary SchoolHot Water Boiler #2 Repair02-Jul-202430-Aug-2024100%
Richmond Rose Public SchoolInstall Partition wall between Kindergarten classrooms 147 and 14802-Aug-202415-Aug-2024100%
Rogers Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Rosedale Heights Public SchoolGarbage Enclosure - Brick Repair11-Mar-202415-Mar-2024100%
Rosedale Heights Public SchoolRetaining Wall Repair - Near Play Structure12-Jul-202430-Jul-2024100%
Ross Doan Public SchoolFloor Finishes Renewal - Library and Main Office01-Jul-202431-Aug-2024100%
Ross Doan Public SchoolHVAC Controls & Instrumentation Renewal and 
Fire Alarm System Renewal
01-May-202431-Oct-2024100%
Ross Doan Public SchoolPaved Playfield Renewal - Kindergarten pen 01-Jul-202431-Aug-2024100%
Ross Doan Public SchoolSecurity System Renewal 18-Jan-202412-Apr-2024100%
Roy H. Crosby Public SchoolSecurity System Renewal 09-Sep-202406-Dec-2024100%
Silver Pines Public SchoolCCTV System Renewal 16-Oct-202331-Jan-2024100%
Silver Pines Public SchoolRemove existing playstructure and reinstate asphalt pavement within kindergarten pen02-Jul-202430-Aug-2024100%
Silver Pines Public SchoolWindows and Exterior Doors Renewal - All16-Oct-202330-Aug-2024100%
Silver Stream Public SchoolSecurity System Renewal 08-Feb-202412-Apr-2024100%
Sir William Mulock Secondary SchoolFloor Finishes Renewal - Main office, Guidance, Staff room and Stage02-Jul-202430-Aug-2024100%
Sir William Mulock Secondary SchoolSecurity System Renewal 06-Jun-202423-Aug-2024100%
Stephen Lewis Secondary SchoolDomestic Water Heaters Renewal02-Jul-202430-Aug-2024100%
Stephen Lewis Secondary SchoolPassenger Elevator Modernization02-Jul-202416-Aug-2024100%
Stephen Lewis Secondary SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Stonebridge Public SchoolInstall Walkway to KG Outdoor Play Area02-Jul-202430-Aug-2024100%
Stonebridge Public SchoolRenovate Storage room 113A into Calming room. 02-Jul-202430-Aug-2024100%
Stonebridge Public SchoolSecurity System Renewal 11-Nov-202423-Dec-202475%
Stonebridge Public SchoolStairwell B & C Stair Flooring Renewal - Including Contrast Strip and Tactile Strips on top and middle landing of both staircases.02-Jul-202430-Aug-2024100%
Stonehaven Elementary SchoolFloor Finishes Renewal - Main office, Library and Staff room02-Jul-202420-Aug-2024100%
Stonehaven Elementary SchoolUnpaved Playfield - Improve Drainage - Between Paved Playfieldand Swale Behind School02-Jul-202423-Aug-2024100%
Stornoway Crescent Public SchoolFloor Finishes Renewal -  Boys washroom 107 and various areas of the school02-Jul-202430-Aug-2024100%
Stuart Scott Public SchoolInspection and Testing of Roof Deck to determine if Siporex30-Aug-202430-Dec-202475%
Sutton District High SchoolBleachers Renewal - Large Gym02-Jul-202430-Aug-2024100%
Sutton District High SchoolFloor Finishes Renewal - Small Gym02-Jul-202419-Aug-2024100%
Sutton District High SchoolInspection and Testing of Roof Deck to determine if Siporex30-Aug-202430-Dec-202475%
Sutton District High SchoolPedestrian Paving Renewal - Front Concrete Walkways 02-Jul-202419-Aug-2024100%
Sutton District High SchoolUnit Ventilators Repairs 19-Feb-202331-Jan-2024100%
Sutton Public SchoolCCTV System Renewal 01-Dec-202330-Apr-2024100%
Sutton Public SchoolDomestic Water Heaters Renewal22-Jul-202423-Aug-2024100%
Sutton Public SchoolUnpaved Playfield - Improve Drainage - Rear Field08-Jul-202416-Aug-2024100%
Terry Fox Public SchoolFloor Finishes Renewal - Main office, Library and Staff room02-Jul-202430-Aug-2024100%
Terry Fox Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Teston Village Public SchoolRemove and restore damaged ceiling in washroom 12802-Jul-202430-Aug-2024100%
Thornhill Public SchoolRoof Covering Renewal - Section R2, R7, R8, R9 and R1002-Jul-202416-Aug-2024100%
Thornhill Woods Public SchoolFloor Finishes Renewal - Library and Music room02-Jul-202416-Aug-2024100%
Thornlea Secondary SchoolRenovate Washroom 254 - Walls, Ceiling and Sinks24-May-202430-Aug-2024100%
Trillium Woods Public SchoolSecurity System Renewal 17-Jun-202423-Aug-2024100%
Unionville High SchoolHeat Pump Renewal - Failed Unit in RCM02-Jul-202430-Aug-2024100%
Unionville High SchoolHeat Pump Renewal - Portable 41402-Jul-202430-Aug-2024100%
Unionville High SchoolInstall Barrier Free Door Operators - Staff room, All Access Washroom (room 149), corridor doors to Tech wing, Tech office 114 and Tech classroom 115.02-Jul-202430-Aug-2024100%
Unionville Public SchoolFire Alarm System Renewal01-Jun-202430-Sep-2024100%
Unionville Public SchoolInstall Padding in Calming Room 138.02-Jul-202430-Aug-2024100%
Uplands Community Learning Centre (Langstaff School)Floor Finishes Renewal - 6 Pack of Portables, including Subfloor- Classrooms Only02-Feb-202422-Mar-2024100%
Uplands Community Learning Centre (Langstaff School)Install Roof Access Ladder to Roof Section R324-Nov-202324-Nov-2023100%
Vellore Woods Public SchoolPedestrian Paving Renewal02-Jul-202430-Aug-2024100%
Vellore Woods Public SchoolSecurity System Renewal 11-Nov-202423-Dec-202475%
Ventura Park Public SchoolHVAC Controls & Instrumentation Renewal03-Jun-202401-Nov-2024100%
Westminster Public SchoolInstall Barrier Free Door Operators -Two hallway doors and one library door02-Jul-202430-Aug-2024100%
Westmount Collegiate lnstituteDesign and Engineering for Chiller and Boiler systems Renewal - Cooling Tower (Phase I) , Boiler System (Phase 2)  and Chiller System (Phase 3) - 2 Year Project01-Jul-202430-Jun-202625%
Westmount Collegiate lnstituteDomestic Water Heaters Renewal29-Apr-202430-Jun-2024100%
Westmount Collegiate lnstituteFloor Finishes Renewal - Dance Studio02-Jul-202416-Aug-2024100%
Westmount Collegiate lnstituteRoof Covering Renewal - Section R6, R7, R10 and R1102-Jul-202416-Aug-2024100%
Westmount Collegiate lnstituteRoom Signage Renewal27-Oct-202312-Jan-2024100%
Westmount Collegiate lnstituteWindows Renewal - Rooms, 226, 304, 326, and  34002-Apr-202419-Apr-2024100%
Whitchurch Highlands Public SchoolDomestic Water Heaters Renewal12-Aug-202431-Aug-2024100%
Wilclay Public SchoolRenovate Rooms  231 and 236   - IT, Electrical, Paint, removal of old Millwork29-Jul-202430-Aug-2024100%
William Armstrong Public SchoolSite Utilities - Main Water Line Renewal02-Jul-202430-Aug-2024100%
William Armstrong Public SchoolSecurity System Renewal 01-Dec-202330-Apr-2024100%
William Berczy Public SchoolFloor Finishes Renewal - Portable02-Jul-202430-Aug-2024100%
Willowbrook Public SchoolFloor Finishes Renewal - Portable Hallway, including Subfloor02-Jan-202405-Jan-2024100%
Willowbrook Public SchoolRoof Covering Renewal - Section R602-Jul-202416-Aug-2024100%
Willowbrook Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Wilshire Elementary SchoolFloor Finishes Renewal - Music room02-Jul-202416-Aug-2024100%
Windham Ridge Public SchoolParking Lot and Pedestrian Paving Renewal03-Jul-202423-Aug-2024100%
Wismer Public SchoolSecurity System Renewal 11-Nov-202423-Dec-202475%
Woodbridge CollegeRoof Covering Renewal - Section R9, R10 and R1103-Jul-202423-Aug-2024100%
Woodbridge Public SchoolTelecom - Phone and Paging Systems Renewal01-Jul-202431-Aug-2024100%
Woodland Public SchoolCCTV System Renewal 16-Oct-202331-Jan-2024100%
Yorkhill Elementary SchoolParking Lot, Roadway and Pedestrian Paving Renewal02-Jul-202423-Aug-2024100%